Rockwool Ltd > Rockwool Solutions > Products > Firepro > Ablative Coated Batt > Standards Ablative Coated Batts


House Insulation
Technical Centre
Coated batt section
Environment
Rockwool UK


new service information section


Home

Careers

Contact

News



Add to My Favorites  MY FAVORITES






Ablative Coated Batt


Standards and approvals
FIRAS logo  ASFP logo
Fire Rating
The FirePro Coated Batt has been tested to prEN 1366-3 and is capable of providing fire resistance periods of 4 hours integrity and 2 hours insulation. The table below indicates the expected performance for various generic service types and supporting constructions.

 Service type 

 Fire resistance¹

 Suppporting construction

 

 Integrity

  Insulation 

None (Blank seal)

  4 hrs

 2 hrs

 Masonry walls and concrete floors

 Up to 2 hrs

 2 hrs

 Plasterboard walls

Individual cables

 Up to 4 hrs

  ≥1 hr

 Masonry walls and concrete floors
 Up to 2 hrs

 ≥1 hr

 Plasterboard walls

Cables supported on trays
or ladders

 Up to 4 hrs

 ≥1 hr

Masonry walls and concrete floors
 Up to 2 hrs

 ≥1 hr

 Plasterboard walls

 Steel and copper pipes (insulated) Up to 4 hrs

 ≥1 hr

Masonry walls and concrete floors
 Up to 2 hrs

 ≥1 hr

 Plasterboard walls

 Steel and copper pipes
(un-insulated)
 Up to 4 hrs

 n/a

 Masonry walls and concrete floors
 Up to 2 hrs

 n/a

 Plasterboard walls

 Plastic pipes Up to 4 hrs

 ≥1 hr

 Masonry walls and concrete floors
 Up to 2 hrs

 ≥1 hr

 Plasterboard walls


¹Performance to be assessed to BS 476:Part 20 until EN standard is finalised


 

| Back |

| Top |
 

Rockwool Limited, Pencoed, Bridgend, CF35 6NY, UK
| 01656 862621 |     |
Copyright © Rockwool Limited, Disclaimer