The FirePro Coated Batt has been tested to prEN 1366-3 and is capable of providing fire resistance periods of 4 hours integrity and 2 hours insulation. The table below indicates the expected performance for various generic service types and supporting constructions.





Ask a question

Ask us a question about our coated batt or product range


 Service type

 Fire resistance ¹

 Supporting construction

 None (Blank seal) 

 4 hrs

  2 hrs 

 Masonry walls and concrete floors
 up to 2 hrs

 2 hrs

 Plasterboard walls

 Individual cables up to 4 hrs

 ≥ 1 hr

 Masonry walls and concrete floors
 up to 2 hrs

 ≥ 1 hr

 Plasterboard walls

 Cables supported on
 trays or ladders
             
 up to 4 hrs

 ≥ 1 hr

 Masonry walls and concrete floors
 up to 2 hrs

 ≥ 1 hr

 Plasterboard walls





Download Now


Download our FirePro product guide


 Steel and copper pipes  
 (insulated)
 up to 4 hrs ≥ 1 hr  Masonry walls and concrete floors
 up to 2 hrs ≥ 1 hr

 Plasterboard walls

 Steel and copper pipes
 (un-insulated)
 up to 4 hrs 

 n/a

 Masonry walls and concrete floors
 up to 2 hrs

 n/a

 Plasterboard walls

 Plastic Pipes up to 4 hrs

≥ 1 hr

 Masonry walls and concrete floors
 up to 2 hrs

≥ 1 hr

 Plasterboard walls






Contractor Rebate Offer

Click to register now.
¹ Performance to be assessed to BS 476:Part 20 until EN standard is finalised

 

 